Required Documents

Required Documents for Projects


Required Documents for both Software Projects

1-  Project Planning & Management Form

2-  Progress Report Meeting Documents (At Least 4, At Most 8)

3-  Graduation Project Final Report

4-  CD (All the produced documents, source codes, database, all outputs of project, etc.)

5- At the end of the term, the Project Final report must be sent to "duygu.celik@emu.edu.tr" and "selin.bitirim@emu.edu.tr". 


In the Project Planning and Management Report, the following items must be done before end of the semester:

Project Planning & Management Report Evaluation Check List

  MAIN HEADINGS CMSE / CMPE / BLGM
1Are Preliminary Project Information tables filled?All 
2Is the Student Group table given or not?All
 
3Is the Introduction To Project (summary of project, key words, aim of project, innovative aspects/contributions of project, methods to be applied, economic and national outcomes etc.) part written properly?All 
4Is there sufficient explanation on the Software Process Life Cycle Model?All 
5Are PERT or CPM techniques used to estimate the project duration? Are these shown in the Network Diagram model?CMSE 
6Is Functional-Point Analysis applied to estimate the Line-Of-Code analysis of the planned project?CMSE 
7Is COCOMO or another estimation technique used to estimate project budget or man-months required?CMSE 
8Is any technique(s) used to reduce the project time duration (eg. Fast Tracking or Crashing)?CMSE 
9Are List of Work Packages discussed with details in tables separately?All 
10Is a Gantt chart created by using a project management tool (eg. MS Project, IBM Rational Pro, etc.)?All 
11Are the List of Milestones (should be matched with the Gantt chart) and start & finish dates given in a table?All 
12Are List of Risks and B Plans discussed in a table?All 
13Is the Project Team List given and responsibilities of team members are discussed in a table?All 
14Is the Organization Scheme illustrated?All 
15Is the Instrument / Equipment / Software / Release Purchases table given?All 
16Is the Estimated Cost Form given?All 


In the Final Report, the following items must be done before  end of this semester:

ABSTRACT

Table of Contents

LIST OF FIGURES

LIST OF TABLES

1. INTRODUCTION

2. PROJECT PLANNING AND MANAGEMENT

3. REQUIREMENTS ANALYSIS

3.1 Functional Requirements

3.2 Non-Functional Requirements

3.3 Realistic constraints

3.4 Ethical issues

4. DESIGN

4.1 High level design (architectural)

4.2 Software design