IMPORTANT NOTICE 1:
All required documents at the end of semester:
1- A Project Planning & Management Report (PPM report)
2- Progress Report Meeting Forms Signed by your Supervisor (At Least 4, At Most 8, Attach them to the Appendix of your Final Report)
3- A Final Report
4- Codes_Docs.rar file (involves IF YOU HAVE ANY the produced documents, source codes, DB Schemas, all outputs of project, etc., NOTE: Please keep your source codes limited enough to be sent by e-mail.)
IMPORTANT NOTICE 2:
Files listed above (1,2,3) must be sent to: "duygu.celik@emu.edu.tr", "nada.kollah@emu.edu.tr" and "YOUR SUPERVISOR MAIL".
IMPORTANT NOTICE 3:
In PPM REPORT, the following items must be done:
| MAIN HEADINGS | CMSE / CMPE / BLGM |
1 | Are Preliminary Project Information tables filled? | All | |
2 | Is the Student Group table given or not? | All | |
3 | Is the Introduction To Project (summary of project, key words, aim of project, innovative aspects/contributions of project, methods to be applied, economic and national outcomes etc.) part written properly? | All | |
4 | Is there sufficient explanation on the Software Process Life Cycle Model? | All | |
5 | Are PERT or CPM techniques used to estimate the project duration? Are these shown in the Network Diagram model? | All | |
6 | Is Functional-Point Analysis applied to estimate the Line-Of-Code analysis of the planned project? | All | |
7 | Is COCOMO or another estimation technique used to estimate project budget or man-months required? | All | |
8 | Is any technique(s) used to reduce the project time duration (eg. Fast Tracking or Crashing)? | CMSE | |
9 | Are List of Work Packages discussed with details in tables separately? | All | |
10 | Is a Gantt chart created by using a project management tool (eg. MS Project, IBM Rational Pro, etc.)? | All | |
11 | Are the List of Milestones (should be matched with the Gantt chart) and start & finish dates given in a table? | All | |
12 | Are List of Risks and B Plans discussed in a table? | All | |
13 | Is the Project Team List given and responsibilities of team members are discussed in a table? | All | |
14 | Is the Organization Scheme illustrated? | All | |
15 | Is the Instrument / Equipment / Software purchase table given? | All | |
16 | PM tools are used?
| All | |
IMPORTANT NOTICE 5:
In the FINAL REPORT,
ABSTRACT
Table of Contents
LIST OF FIGURES
LIST OF TABLES
1. INTRODUCTION
2. PROJECT PLANNING AND MANAGEMENT (This section is only for Software Projects)
3. REQUIREMENTS ANALYSIS
3.1 Functional Requirements
3.2 Non-Functional Requirements
3.3 Realistic constraints
3.4 Ethical issues
4. DESIGN
4.1 High level design (architectural)
4.2 Software design (USER INTERFACES, UML DESIGNS, DATABASE DESIGNS, ETC.)